(a) Approval tests. The manufacturer must produce a lot of at least 100 signalsfrom which samples must be taken for testing for approval under § 160.024–7. The approval tests are the operational tests and technical tests in paragraphs (c) and (d) of this section. The approval tests must be conducted by an independent laboratory accepted by the Commandant under § 159.010 of this chapter.
CFR 46-160.024-4-2014由US-CFR-file 发布于 2014-09-29,并于 2014-09-29 实施。
非常抱歉,我们暂时无法提供预览,您可以试试: 免费下载 CFR 46-160.024-4-2014 前三页,或者稍后再访问。
点击下载后,生成下载文件时间比较长,请耐心等待......
Copyright ©2007-2022 ANTPEDIA, All Rights Reserved
京ICP备07018254号 京公网安备1101085018 电信与信息服务业务经营许可证:京ICP证110310号