ZH

RU

ES

First discharge time

First discharge time, Total:43 items.

In the international standard classification, First discharge time involves: Powder metallurgy, Non-ferrous metals, Graphic technology, Measurement of fluid flow, Applications of information technology, Galvanic cells and batteries, Electromagnetic compatibility (EMC), Electronic tubes, Solar energy engineering, Electronic display devices, Integrated circuits. Microelectronics, Insulating materials, Electricity. Magnetism. Electrical and magnetic measurements, Insulation, Aerospace electric equipment and systems, Cinematography, TELECOMMUNICATIONS. AUDIO AND VIDEO ENGINEERING.


国家市场监督管理总局、中国国家标准化管理委员会, First discharge time

  • GB/T 39864-2021 Electrochemical performance test of lithium manganese oxide—Test method for the initial specific discharge capacity and the initial efficiency
  • GB/T 37201-2018 Electrochemical performance test of lithium nickel cobalt manganese oxide —Test method for discharge specific capacity and charge-discharge coulombic efficiency of the first cycle

General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China, First discharge time

  • GB/T 23365-2023 Lithium cobalt oxide electrochemical performance test first discharge specific capacity and first charge and discharge efficiency test method
  • GB/T 23365-2009 Electrochemical performance test of lithium cobalt oxide.Test method for specific capacity and charge.discharge efficiency of the first cycle
  • GB/T 42161-2022 Electrochemical performance test of lithium iron phosphate—Test method for the initial discharge specific capacity and the initial efficiency
  • GB/T 43093-2023 Lithium nickel manganese oxide electrochemical performance test first discharge specific capacity and first charge and discharge efficiency test method

British Standards Institution (BSI), First discharge time

  • BS ISO/IEC 17629:2014 Information technology. Office equipment. Method for measuring first print out time for digital printing devices
  • BS EN ISO 6416:2017 Tracked Changes. Hydrometry. Measurement of discharge by the ultrasonic transit time (time of flight) method
  • BS PD CEN/TR 16152:2011 Electronic fee collection. Personalisation and mounting of first mount OBE
  • DD IEC/TS 61934:2011 Electrical insulating materials and systems. Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
  • BS EN 2349-305:2007 Aerospace series - Requirements and test procedures for relays and contactors - Bounce time
  • BS EN 2349-305:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 305: Bounce time

International Organization for Standardization (ISO), First discharge time

  • ISO/IEC 17629:2014 Information technology - Office equipment - Method for measuring first print out time for digital printing devices
  • ISO 4241:2019 Cinematography — Projection film leader (time-based), trailer and cue marks — Specifications

German Institute for Standardization, First discharge time

  • DIN 40763-2:1990 Nickel-cadmium batteries; cells with fibre structured plates; cells in plastic containers; discharge current, final discharge voltages, discharge time
  • DIN 40763-2:1990-09 Nickel-cadmium batteries; cells with fibre structured plates; cells in plastic containers; discharge current, final discharge voltages, discharge time
  • DIN 40771-2:1981 Nickel-cadmium-accumulators; cells with pocket-type plates, cells in steel and plastic containers; electrical characteristics; discharge duration
  • DIN IEC/TS 61934:2012-09*DIN SPEC 41934:2012-09 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses (IEC/TS 61934:2011)
  • DIN EN 2349-305:2007 Aerospace series - Requirements and test procedures for relays and contactors - Part 305: Bounce time; German and English version EN 2349-305:2006

American Society for Testing and Materials (ASTM), First discharge time

  • ASTM D6820-02(2007) Standard Guide for Use of the Time Domain Electromagnetic Method for Subsurface Investigation
  • ASTM D6820-02 Standard Guide for Use of the Time Domain Electromagnetic Method for Subsurface Investigation

Professional Standard - Aerospace, First discharge time

  • QJ 1323.26-1987 Electromagnetic relay test method action, release and bounce time test

Professional Standard - Electron, First discharge time

  • SJ 1393-1978 Methods of measurement for cathode preheating time of gas discharge noise tubes

Association Francaise de Normalisation, First discharge time

  • NF L58-100-304*NF EN 2349-304:2007 Aerospace series - Requirements and test procedures for relays and contactors - Part 304 : operate and release time
  • NF C73-256:1980 Appareils électrodomestiques chauffants - Appareils de chauffage des locaux de type à accumulation à décharge réglable conçus exclusivement pour un temps nominal de charge de 8 h - Règles d'aptitude à la fonction (changement de statut de NF C ...

Korean Agency for Technology and Standards (KATS), First discharge time

  • KS C 8539-2005 Testing procedure of long discharge rate lead-acid batteries for photovoltaic systems

RU-GOST R, First discharge time

  • GOST R 50446-1992 Gas-discharge sign-synthesizing indicators. Method of frequency time measaring characteristics
  • GOST 23089.6-1983 Integrated circuits. Method of measuring the operational amplifiers output voltage settling time
  • GOST 23089.10-1983 Integrated circuits. Method of measuring the operational amplifiers output voltage maximum build-up rate and time

Defense Logistics Agency, First discharge time

ESD - ESD ASSOCIATION, First discharge time

  • TR3.0-01-2002 Alternate Techniques for Measuring Ionizer Offset Voltage and Discharge Time (Formerly TR13-02)
  • TR5.2-01-2001 Machine Model (MM) Electrostatic Discharge (ESD) Investigation - Reduction in Pulse Number and Delay Time (Formerly ESD TR10-01)

International Electrotechnical Commission (IEC), First discharge time

  • IEC TS 61934:2006 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
  • IEC TS 61934:2011 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
  • IEC 112/152/CD:2010 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses

European Committee for Standardization (CEN), First discharge time

  • EN 2349-305:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 305: Bounce time

Institute of Electrical and Electronics Engineers (IEEE), First discharge time

  • IEEE PC37.06.1/D6, October 2017 IEEE Draft Recommended Practice for Preferred Ratings for High-Voltage (>1000 volts) AC Circuit Breakers Designated Definite Purpose for Fast Transient Recovery Voltage Rise Times
  • IEEE PC37.06.1/D5, April 2017 IEEE Draft Recommended Practice for Preferred Ratings for High-Voltage (>1000 volts) AC Circuit Breakers Designated Definite Purpose for Fast Transient Recovery Voltage Rise Times
  • IEEE PC37.06.1/D3, July 2016 IEEE Draft Recommended Practice for Preferred Ratings for High-Voltage (>1000 volts) AC Circuit Breakers Designated Definite Purpose for Fast Transient Recovery Voltage Rise Times
  • IEEE Std C37.06.1-2017 IEEE Recommended Practice for Preferred Ratings for High-Voltage(>1000 volts) AC Circuit Breakers Designated Definite Purpose for Fast Transient Recovery Voltage Rise Times

IEC - International Electrotechnical Commission, First discharge time

  • TS 61934-2006 Electrical insulating materials and systems – Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses (Edition 1.0)

IEEE - The Institute of Electrical and Electronics Engineers@ Inc., First discharge time

  • IEEE C37.06.1-2017 Recommended Practice for Preferred Ratings for High-Voltage (>1000 volts) AC Circuit Breakers Designated Definite Purpose for Fast Transient Recovery Voltage Rise Times

IX-EU/EC, First discharge time

  • COM(94) 440-1994 Green Paper on the Liberalisation of Telecommunications Infrastructure and Cable Television Networks: Part One Principle and Timetable




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved