ZH

RU

ES

schedule same period

schedule same period, Total:125 items.

In the international standard classification, schedule same period involves: Electrical accessories, Finances. Banking. Monetary systems. Insurance, Farming and forestry, Company organization and management, Buildings, Fuels, Standardization. General rules, Shipbuilding and marine structures in general, Electricity. Magnetism. Electrical and magnetic measurements, Construction industry, Power transmission and distribution networks, Audio, video and audiovisual engineering, Wastes, Switchgear and controlgear, Information technology (IT) in general, Telecommunications in general, Petroleum products in general, Industrial automation systems, Aerospace electric equipment and systems, Applications of information technology, Components and accessories for telecommunications equipment, Air quality, Internal combustion engines, Plastics, Information sciences. Publishing, Space systems and operations, Microbiology, Animal feeding stuffs, Vocabularies, Law. Administration, Cycles.


GB-REG, schedule same period

Underwriters Laboratories (UL), schedule same period

  • UL 651 BULLETIN-2008 UL Standard for Safety Schedule 40 and 80 Rigid PVC Conduit and Fittings (COMMENTS DUE: JANUARY 31@ 2008)
  • UL 651 BULLETIN-2009 UL Standard for Safety Schedule 40 and 80 Rigid PVC Conduit and Fittings (COMMENTS DUE: NOVEMBER 12@ 2009)
  • UL 651 BULLETIN-2007 UL Standard for Safety Schedule 40 and 80 Rigid PVC Conduit and Fittings (COMMENTS DUE: APRIL 23@ 2007)
  • UL 651 BULLETIN-2011 UL Standard for Safety Schedule 40 and 80 Rigid PVC Conduit and Fittings (COMMENTS DUE: JULY 11@ 2011)
  • UL 651 BULLETIN-2019 UL Standard for Safety Schedule 40@ 80@ Type EB and A Rigid PVC Conduit and Fittings (COMMENTS DUE: August 26@ 2019)
  • UL 651 BULLETIN-2014 UL Standard for Safety Schedule 40@ 80@ Type EB and A Rigid PVC Conduit and Fittings (COMMENTS DUE: MARCH 31@ 2014)
  • UL 651 BULLETIN-2018 UL Standard for Safety Schedule 40@ 80@ Type EB and A Rigid PVC Conduit and Fittings (COMMENTS DUE: May 11@ 2018)
  • UL 651 BULLETIN-2012 UL Standard for Safety Schedule 40@ 80@ Type EB and A Rigid PVC Conduit and Fittings (COMMENTS DUE: FEBRUARY 20@ 2012)
  • UL SUBJECT 2269-2007 Outline of Investigation for Optical Fiber/ Communications/Signaling/Coaxial Cable Outlet Boxes (Issue 2)
  • UL 497C BULLETIN-2012 UL Standard for Safety Protectors for Coaxial Communications Circuits (COMMENTS DUE: December 10@ 2012)
  • UL 497C BULLETIN-2016 UL Standard for Safety Protectors for Coaxial Communications Circuits (COMMENTS DUE: February 6@ 2017)
  • UL 497C BULLETIN-2008 UL Standard for Safety Protectors for Coaxial Communications Circuits (COMMENTS DUE: August 11@ 2008)

Professional Standard - Machinery, schedule same period

Professional Standard - Finance, schedule same period

Shanxi Provincial Standard of the People's Republic of China, schedule same period

Hebei Provincial Standard of the People's Republic of China, schedule same period

  • DB1306/T 211-2023 Technical specifications for synchronized estrus of breeding ewes in different seasons
  • DB13/T 5108-2019 Technical regulations for the treatment of simultaneous estrus in sheep

Sichuan Provincial Standard of the People's Republic of China, schedule same period

Standard Association of Australia (SAA), schedule same period

Inner Mongolia Provincial Standard of the People's Republic of China, schedule same period

  • DB15/T 2720-2022 Technical Regulations for Simultaneous Estrus of Dairy Goats
  • DB15/T 2042-2020 Mutton Sheep Simultaneous Estrus and Artificial Insemination Technical Regulations
  • DB15/T 2800-2022 Technical specification for simultaneous shedding of cashmere goats under light control
  • DB15/T 1969-2020 Technical operation rules for sheep artificial insemination and estrus synchronization
  • DB15/T 3188-2023
  • DB15/T 852.2-2015 Mongolian Sheep Efficient Breeding Technical Regulations Part 2: Mongolian Sheep Simultaneous Estrus Treatment Technical Regulations

British Standards Institution (BSI), schedule same period

  • HB 10159-1999 Pre-contract Practice for the Building Team - 8th edition
  • BS EN 122180:1996 Harmonized system of quality assessment for electronic components - Sectional specification - Radio frequency coaxial connectors - Series SSMC
  • BS EN ISO 1600:1991 Plastics. Cellulose acetate. Determination of light absorption of moulded specimens produced using different periods of heating
  • BS EN ISO 1600:1999 Plastics - Cellulose acetate - Determination of light absorption of moulded specimens produced using different periods of heating
  • PD IEC TR 61244-4:2019 Determination of long-term radiation ageing in polymers. Effects of different temperatures and dose rates under radiation condition
  • BS ISO 8178-4:2017 Reciprocating internal combustion engines. Exhaust emission measurement. Steady-state and transient test cycles for different engine applications
  • BS DD CEN/TS 15790:2008 Animal feeding stuffs - PCR typing of probiotic strains of Saccharomyces cerevisiae (yeast)
  • BS DD CEN/TS 15790:2009 Animal feeding stuffs. PCR typing of probiotic strains of Saccharomyces cerevisiae (yeast)

RU-GOST R, schedule same period

Group Standards of the People's Republic of China, schedule same period

  • T/MIA 0003-2020 Specifications for collaborative review of multimedia film and television post-production
  • T/CIMA 0007-2020 Test guideline for synchronous line loss measuring device of distribution network
  • T/CAAA 072-2021 Technical programs of artificial insemination with synchronous estrus in sika deer
  • T/SMA 0032-2022 10kV Sub-line Synchronous Line Loss Rate Abnormal Troubleshooting Technical Guidelines
  • T/CEC 413-2020 Calibration specification for high-voltage electric energy measuring device for synchronous line loss
  • T/NAASS 014-2022 Regulations for synchronous ovulation and timed artificial insemination of Ningxia Large-scale dairy Farm
  • T/CICC 16014-2021 Intelligence sharing and police collaboration model life cycle activity specification
  • T/CEC 412-2020 General technical requirements for high-voltage electric energy measuring devices for synchronous line loss
  • T/CAMMT 54.4-2023 Model based network collaboration manufacturing – Part 4: Application of model life-cycle
  • T/ZAS 4009.17-2021 Specification for "One thing" for life-cycle of the personal and enterprises— Part17: Getting water、electricity、gas and network

Professional Standard - Electricity, schedule same period

  • DL/T 1348-2014 General technical requirements for automatic quasi-synchronization device
  • DL/T 2180-2020 General technical requirements for synchronous line loss measuring devices of distribution network

ASHRAE - American Society of Heating@ Refrigerating and Air-Conditioning Engineers@ Inc., schedule same period

  • ASHRAE TO-98-23-4-1998 Prediction of Short-Term and Long-Term VOC Emissions from SBR Bitumen-Backed Carpet under Different Temperatures

CZ-CSN, schedule same period

Ningxia Provincial Standard of the People's Republic of China, schedule same period

  • DB64/T 1784-2021 Technical regulations for timing insemination of dairy cows with synchronous ovulation

Hunan Provincial Standard of the People's Republic of China, schedule same period

  • DB43/T 2478-2022 Technical Regulations of Timing Insemination of Goats with Simultaneous Estrus
  • DB43/T 1935-2020 Technical regulations for timed insemination of cattle in estrus at the same time in Xiangxi

GM North America, schedule same period

  • GM 9986105-2014 Friction Modified, Synchromesh Transmission Fluid (Issue 2)

Professional Standard-Ships, schedule same period

  • CB/T 3441-2019 Technical conditions of automatic quasi-synchronization device for ship power station
  • CB/T 3441-1992 Technical conditions of automatic quasi-synchronization device for ship power station

NZ-SNZ, schedule same period

  • NZS 3917:2013 Conditions of contract for building and civil engineering - Fixed term

Guizhou Provincial Standard of the People's Republic of China, schedule same period

  • DB52/T 908-2014 Operational technical rules for timed insemination of cattle with simultaneous estrus

Shaanxi Provincial Standard of the People's Republic of China, schedule same period

  • DB61/T 1671-2023 Technical specifications for simultaneous estrus and artificial insemination of meat rabbits

German Institute for Standardization, schedule same period

  • DIN ISO 6692:1989-03 Cycles; marking of cycles components; identical with ISO 6692:1981
  • DIN EN 2591-321:1997 Aerospace series - Elements of electrical and optical connection; test methods - Part 321: Damp heat, cyclic test; German version EN 2591-321:1997
  • DIN EN ISO 8178-4:1996 Reciprocating internal combustion engines - Exhaust emission measurement - Part 4: Test cycles for different engine applications (ISO 8178-4:1996); German version EN ISO 8178-4:1996
  • DIN CEN/TS 15790:2009 Animal feeding stuffs - PCR typing of probiotic strains of Saccharomyces cerevisiae (yeast); German version CEN/TS 15790:2008

United States Navy, schedule same period

Guangxi Provincial Standard of the People's Republic of China, schedule same period

  • DB45/T 2313-2021 Simultaneous estrus of milk buffalo - technical regulations for artificial insemination

ECSS - European Cooperation for Space Standardization, schedule same period

  • Q-ST-70-18C-2008 Preparation@ assembly and mounting of RF coaxial cables (Second Issue)
  • E-ST-50-01C-2008 Space data links - Telemetry synchronization and channel coding (Second Issue)
  • E-ST-50-04C-2008 Space data links - Telecommand protocols@ synchronization and channel coding (Second Issue)

General Administration of Quality Supervision, Inspection and Quarantine of the People‘s Republic of China, schedule same period

  • GB/T 12751-1991 The specification of one channel high quality sound in sync
  • GB/T 30846-2014 High-voltage alternating current circuit-breakers with intentionally non-simultaneous pole operation
  • GB/T 42383.4-2023 Collaborative Design of Intelligent Manufacturing Network Part 4: Design Requirements for the Whole Life Cycle
  • GB/Z 28820.4-2022 Long-term radiation ageing in polymers—Part 4: Effects of different temperatures and dose rates under radiation conditions

NO-SN, schedule same period

  • NS 9430-2013 General contract conditions concerning periodic collection and transport of waste

Institute of Electrical and Electronics Engineers (IEEE), schedule same period

  • IEEE Std 1255-2000 IEEE Guide for Evaluation of Torque Pulsations During Starting of Synchronous Motors

Association Francaise de Normalisation, schedule same period

  • NF T30-806:1991 Peintures et vernis - Travaux de peinture des bâtiments - Schéma de contrat d'entretien périodique.
  • T30-806:1991 Paints and varnishes. Painting of building. Specimen contract for periodic maintenance.
  • NF G90-056:1977 Machines à coudre domestiques - Essai de glissement l'une sur l'autre de deux épaisseurs d'un même matériau au cours de leur assemblage sur machine.
  • NF E37-211-4:2008 Reciprocating internal combustion engines - Exhaust emission measurement - Part 4 : steady-state test cycles for different engine applications.
  • NF T51-358*NF EN ISO 1600:1999 Plastics. Cellulose acetate. Determination of light absorption on moulded specimens produced using different periods of heating.
  • NF E37-211-4:1996 Reciprocating internal combustion engines. Exhaust emission measurement. Part 4 : test cycles for different engine applications.
  • NF S97-555:2007 Informatique de santé - Règles permettant un contrôle de cohérence entre différents identifiants des spécialités pharmaceutiques et/ou leurs présentations lors des échanges d'informations entre systèmes différents

International Telecommunication Union (ITU), schedule same period

  • ITU-R S.1325-3-2003 Simulation methodologies for determining statistics of short-term interference between co-frequency codirectional non-geostationary-satellite orbit fixed-satellite service systems in circular orbits and other non-geostationary fixed-satellite service syst
  • ITU-R S.1325-3 SPANISH-2003 Simulation methodologies for determining statistics of short-term interference between co-frequency, codirectional non-geostationary-satellite orbit fixed-satellite service systems in circular orbits and other non-geostationary fixed-satellite service sys
  • ITU-R QUESTION 210-1/4-2007 Technical characteristics for mobile earth stations operating with global non-geostationary-satellite systems in the mobile-satellite service in the band 1-3 GHz

GOSTR, schedule same period

  • GOST R 58263-2018 Rehabilitation of desabled persons. Services on accompaniment during promotion of employment of persons with disabilities

Defense Logistics Agency, schedule same period

  • DLA QPL-5790-19-2007 TRANSMITTER, PRESSURE, OIL, SYNCHRO, 0-200 PSI 320-DEGREE MOVEMENT, 26V, SINGLE PHASE, 400 CYCLES

未注明发布机构, schedule same period

Lithuanian Standards Office , schedule same period

  • LST EN 300 912 V7.1.1-2000 Digital cellular telecommunications system (Phase 2+). Radio subsystem synchronization (GSM 05.10 version 7.1.1 Release 1998)
  • LST ISO 8601:2006 Data elements and interchange formats - Information interchange - Representation of dates and times (identical ISO 8601:2004)
  • LST ISO 9707:2011 Information and documentation - Statistics on the production and distribution of books, newspapers, periodicals and electronic publications (ISO 9707:2008, identical)
  • LST ISO 6742-2:2011 Cycles - Lighting and retro-reflective devices - Photometric and physical requirements - Part 2: Retro-reflective devices (ISO 6742-2:1985, identical)

ETSI - European Telecommunications Standards Institute, schedule same period

  • PRETS 300 912-1996 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (GSM 05.10; VERSION 5.1.0)
  • ETS 300 912-1997 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (GSM 05.10 Version 5.1.1)
  • ETSI EN 300 912:1998 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (GSM 05.10 Version 6.3.0 Release 1997)
  • ETSI EN 300 912:2000 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (GSM 05.10 Version 8.2.0 Release 1999)
  • ETSI EN 300 912:1999 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (GSM 05.10 Version 6.4.1 Release 1997)
  • TS 100 912-2003 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (3GPP TS 05.10 Version 8.11.0 Release 1999)
  • TS 100 912-2002 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (3GPP TS 05.10 Version 8.10.0 Release 1999)
  • TS 100 912-2001 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (3GPP TS 05.10 Version 8.8.0 Release 1999)
  • ETSI EN 300 912:2001 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (GSM 05.10 Version 6.6.1 Release 1997)
  • TS 145 010-2002 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (3GPP TS 45.010 Version 5.0.0 Release 5)
  • ETS 300 912-1999 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (Second Edition; GSM 05.10 Version 5.2.2 Release 1996)
  • TS 100 912-2000 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Syncronization (3GPP TS 05.10 Version 5.4.1 Release 1996)
  • PRETS 300 912-1999 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (Second Edition; GSM 05.10 Version 5.2.1 Release 1996)
  • TS 145 010-2001 Digital Cellular Telecommunications System (Phase 2+); Radio Subsystem Synchronization (3GPP TS 45.010 Version 4.1.0 Release 4)

National Aeronautics and Space Administration (NASA), schedule same period

Canadian Standards Association (CSA), schedule same period

  • CAN/CSA-C391-2015 Mise à l’essai des machines synchrones triphasées lors de la remise à neuf (Première édition; Mise à jour n ° 1 : Septembre 2015)

American Society for Testing and Materials (ASTM), schedule same period

  • ASTM D6708-08 Standard Practice for Statistical Assessment and Improvement of Expected Agreement Between Two Test Methods that Purport to Measure the Same Property of a Material

International Organization for Standardization (ISO), schedule same period

  • ISO 8178-4:1996 Reciprocating internal combustion engines - Exhaust emission measurement - Part 4: Test cycles for different engine applications
  • ISO 8178-4:2007 Reciprocating internal combustion engines - Exhaust emission measurement - Part 4: Steady-state test cycles for different engine applications

US-CFR-file, schedule same period

  • CFR 42-412.536-2014 Public Health. Part412:Prospective payment systems for inpatient hospital services. Section412.536:Special payment provisions for long-term care hospitals and satellites of long-term care hospitals that discharged Medicare patients admitted from a hospita
  • CFR 7-765.351-2013 Agriculture. Part765:Direct loan servicing-regular. Section765.351:Requirements to obtain Agency consent.

Japanese Industrial Standards Committee (JISC), schedule same period

  • JIS B 8008-4:2009 Reciprocating internal combustion engines -- Exhaust emission measurement -- Part 4: Steady-state test cycles for different engine applications
  • JIS B 8008-4:2000 Reciprocating internal combustion engines -- Exhaust emission measurement -- Part 4: Test cycles for different engine applications

AT-ON, schedule same period

Electronic Components, Assemblies and Materials Association, schedule same period

  • ECA SP3458-1997 Blank Detail Specification for Discrete Contracts of Certified Quality Comment Period Expires: September 22, 1997; EIA-700DA00

ITU-R - International Telecommunication Union/ITU Radiocommunication Sector, schedule same period

  • ITU-R S.1325-1997 Simulation Methodology for Assessing Short-Term Interference between Co-Frequency@ Codirectional Non-Geostationary-Satellite Orbit (GSO) Fixed-Satellite Service (FSS) Networks and Other Non-GSO FSS or GSO FSS Networks

Korean Agency for Technology and Standards (KATS), schedule same period

  • KS R ISO 8178-4:2007 Reciprocating internal combustion engines-Exhaust emission measurement-Part 4:Test cycles for different engine applications

European Committee for Standardization (CEN), schedule same period

  • PD CEN/TS 15790:2008 Animal feeding stuffs - PCR typing of probiotic strains of Saccharomyces cerevisiae (yeast)




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved