ZH

RU

ES

Super electric discharge time

Super electric discharge time, Total:64 items.

In the international standard classification, Super electric discharge time involves: Rectifiers. Convertors. Stabilized power supply, Measurement of fluid flow, Galvanic cells and batteries, Power transmission and distribution networks, Solar energy engineering, Electronic tubes, Integrated circuits. Microelectronics, Insulating materials, Electricity. Magnetism. Electrical and magnetic measurements, Insulation, Electronic display devices, Cinematography, Aerospace electric equipment and systems, TELECOMMUNICATIONS. AUDIO AND VIDEO ENGINEERING, Protection against fire, Electrical wires and cables, Fruits. Vegetables, Audio, video and audiovisual engineering, Electronic components in general, Electromagnetic compatibility (EMC).


Group Standards of the People's Republic of China, Super electric discharge time

British Standards Institution (BSI), Super electric discharge time

  • BS EN ISO 6416:2017 Tracked Changes. Hydrometry. Measurement of discharge by the ultrasonic transit time (time of flight) method
  • DD IEC/TS 61934:2011 Electrical insulating materials and systems. Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
  • BS EN 2349-305:2007 Aerospace series - Requirements and test procedures for relays and contactors - Bounce time
  • BS EN 2349-305:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 305: Bounce time
  • BS EN 2349-304:2007 Aerospace series - Requirements and test procedures for relays and contactors - Operate and release time
  • BS EN 2349-304:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 304: Operate and release time
  • BS 8436:2004 Electric cables - 300/500 V screened electric cables having low emission of smoke and corrosive gases when affected by fire, for use in walls, partitions and building voids - Multicore cables
  • BS 7211:2012 Electric cables. Thermosetting insulated and thermoplastic sheathed cables for voltages up to and including 450/750 V for electric power and lighting and having low emission of smoke and corrosive gases when affected by fire
  • BS 8436:2011 Electric cables. Specification for 300/500 V screened electric cables having low emission of smoke and corrosive gases when affected by fire, for use in walls, partitions and building voids. Multicore cables

German Institute for Standardization, Super electric discharge time

  • DIN 40763-2:1990 Nickel-cadmium batteries; cells with fibre structured plates; cells in plastic containers; discharge current, final discharge voltages, discharge time
  • DIN 40763-2:1990-09 Nickel-cadmium batteries; cells with fibre structured plates; cells in plastic containers; discharge current, final discharge voltages, discharge time
  • DIN 40771-2:1981 Nickel-cadmium-accumulators; cells with pocket-type plates, cells in steel and plastic containers; electrical characteristics; discharge duration
  • DIN IEC/TS 61934:2012-09*DIN SPEC 41934:2012-09 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses (IEC/TS 61934:2011)
  • DIN IEC/TS 61934:2012 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses (IEC/TS 61934:2011)
  • DIN EN 2349-305:2007 Aerospace series - Requirements and test procedures for relays and contactors - Part 305: Bounce time; German and English version EN 2349-305:2006
  • DIN EN 60099-8:2011 Surge arresters - Part 8: Metal-oxide surge arresters with external series gap (EGLA) for overhead transmission and distribution lines of a.c. systems above 1 kV (IEC 60099-8:2011); German version EN 60099-8:2011
  • DIN EN 2349-304:2007 Aerospace series - Requirements and test procedures for relays and contactors - Part 304: Operate and release time; German and English version EN 2349-304:2006
  • DIN EN 2349-304:2007-05 Aerospace series - Requirements and test procedures for relays and contactors - Part 304: Operate and release time; German and English version EN 2349-304:2006
  • DIN 15578-2:1978 Length-measuring of perforated motion-picture films and magnetic tapes; tabels of running times 1 to 60 s in relation to film length
  • DIN 15578-3:1978 Length-measuring of perforated motion-picture films and magnetic tapes; tables of running times 1 to 120 min in relation to film length

ZA-SANS, Super electric discharge time

  • NRS 039-2-1999 Surge arresters for use in distribution systems Part 2: Distribution class, gapless metal-oxide surge arresters

Professional Standard - Aerospace, Super electric discharge time

  • QJ 1323.26-1987 Electromagnetic relay test method action, release and bounce time test

Electrostatic Discharge Association (ESDA), Super electric discharge time

  • ANSI/ESD SP5.5.2-2007 Electrostatic Discharge Sensitivity Testing Very Fast Transmission Line Pulse (VF-TLP) - Component Level

ESD - ESD ASSOCIATION, Super electric discharge time

  • SP5.5.2-2007 ELECTROSTATIC DISCHARGE SENSITIVITY TESTING - VERY FAST TRANSMISSION LINE PULSE (VF-TLP) - COMPONENT LEVEL
  • TR3.0-01-2002 Alternate Techniques for Measuring Ionizer Offset Voltage and Discharge Time (Formerly TR13-02)
  • TR5.2-01-2001 Machine Model (MM) Electrostatic Discharge (ESD) Investigation - Reduction in Pulse Number and Delay Time (Formerly ESD TR10-01)

Korean Agency for Technology and Standards (KATS), Super electric discharge time

  • KS C 8539-2005 Testing procedure of long discharge rate lead-acid batteries for photovoltaic systems

Professional Standard - Electron, Super electric discharge time

  • SJ 1393-1978 Methods of measurement for cathode preheating time of gas discharge noise tubes

Association Francaise de Normalisation, Super electric discharge time

  • NF L58-100-304*NF EN 2349-304:2007 Aerospace series - Requirements and test procedures for relays and contactors - Part 304 : operate and release time
  • NF C73-256:1980 Appareils électrodomestiques chauffants - Appareils de chauffage des locaux de type à accumulation à décharge réglable conçus exclusivement pour un temps nominal de charge de 8 h - Règles d'aptitude à la fonction (changement de statut de NF C ...

RU-GOST R, Super electric discharge time

  • GOST 23089.6-1983 Integrated circuits. Method of measuring the operational amplifiers output voltage settling time
  • GOST R 50446-1992 Gas-discharge sign-synthesizing indicators. Method of frequency time measaring characteristics
  • GOST 23089.10-1983 Integrated circuits. Method of measuring the operational amplifiers output voltage maximum build-up rate and time
  • GOST 29178-1991 Electromagnetic compatibility of technical means. HUF electrovacuum equipment. Generators, amplifiers and modules on their basis. Requirements for side oscillations levels

International Electrotechnical Commission (IEC), Super electric discharge time

  • IEC TS 61934:2006 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
  • IEC TS 61934:2011 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
  • IEC 112/152/CD:2010 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses

Defense Logistics Agency, Super electric discharge time

  • DLA MIL-R-83726/12 E VALID NOTICE 1-2011 Relays, Hybrid, Time Delay (on Release), Type IIA, Class B, 10 Amperes, 4PDT, Hermetically Sealed, Fixed Time, 0.100 to 300 Seconds
  • DLA MIL-PRF-83726/20 E-2008 RELAY, SOLID-STATE, TIME DELAY (ON OPERATE), TYPE I, CLASS C, SPST, 250 MILLIAMPERES, FIXED TIME, 0.05 TO 500 SECONDS
  • DLA MIL-DTL-3971/1 F-2008 METERS, TIME TOTALIZING, NON-HERMETICALLY SEALED, ELECTRICAL: TYPE 1, 10-40V OR 40-130V OR 10-130V: GRADES A AND B, 2 HOLE AND 3 HOLE FLANGE
  • DLA MIL-DTL-3971/2 E-2008 METERS, TIME TOTALIZING, NON-HERMETICALLY SEALED, ELECTRICAL: TYPE II, 120V, 60 Hz AND 120V, 400 Hz GRADES A AND B, 2 HOLE AND 3 HOLE FLANGE

IEC - International Electrotechnical Commission, Super electric discharge time

  • TS 61934-2006 Electrical insulating materials and systems – Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses (Edition 1.0)

International Organization for Standardization (ISO), Super electric discharge time

  • ISO 21727:2016 Cinematography - Method of measurement of perceived loudness of short duration motion-picture audio material
  • ISO 4241:2019 Cinematography — Projection film leader (time-based), trailer and cue marks — Specifications

BE-NBN, Super electric discharge time

European Committee for Standardization (CEN), Super electric discharge time

  • EN 2349-305:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 305: Bounce time
  • EN 2349-304:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 304: Operate and release time

IX-EU/EC, Super electric discharge time

  • COM(94) 440-1994 Green Paper on the Liberalisation of Telecommunications Infrastructure and Cable Television Networks: Part One Principle and Timetable

Institute of Electrical and Electronics Engineers (IEEE), Super electric discharge time

  • IEEE P535/DB, September 2017 IEEE Draft Standard for Qualification of Class 1E Vented Lead Acid Storage Batteries for Nuclear Power Generating Stations - Corrigendum 1: Clarification of Thermal Aging Durations
  • IEEE P535/DC, October 2017 IEEE Draft Standard for Qualification of Class 1E Vented Lead Acid Storage Batteries for Nuclear Power Generating Stations - Corrigendum 1: Clarification of Thermal Aging Durations
  • IEEE P535/DA, March 2017 IEEE Draft Standard for Qualification of Class 1E Vented Lead Acid Storage Batteries for Nuclear Power Generating Stations - Corrigendum 1: Clarification of Thermal Aging Durations
  • IEEE P693a/D1, August 2022 IEEE Draft Recommended Practice for Seismic Design of Substations Amendment: Alterations of Transformers and Select Appendages, Surge Arresters, Response Spectra, Time Histories, and Their Qualification Methodologies

Danish Standards Foundation, Super electric discharge time

  • DS/EN 2349-304:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 304: Operate and release time

Lithuanian Standards Office , Super electric discharge time

  • LST EN 2349-304-2007 Aerospace series - Requirements and test procedures for relays and contactors - Part 304: Operate and release time

ES-UNE, Super electric discharge time

  • UNE-EN 2349-304:2006 Aerospace series - Requirements and test procedures for relays and contactors - Part 304: Operate and release time (Endorsed by AENOR in March of 2007.)

European Association of Aerospace Industries, Super electric discharge time

  • AECMA PREN 2349-304-2000 Aerospace Series Requirements and Test Procedures for Relays and Contactors Part 304: Operate and Release Time Edition P 1

Aerospace, Security and Defence Industries Association of Europe (ASD), Super electric discharge time

  • ASD-STAN PREN 2349-304-2000 Aerospace Series Requirements and Test Procedures for Relays and Contactors Part 304: Operate and Release Time (Edition P 1)

International Telecommunication Union (ITU), Super electric discharge time

  • ITU-R RA.1513-2-2015 Levels of data loss to radio astronomy observations and percentage-of-time criteria resulting from degradation by interference for frequency bands allocated to the radio astronomy service on a primary basis
  • ITU-R RA.1513-1-2003 Levels of data loss to radio astronomy observations and percentage-of-time criteria resulting from degradation by interference for frequency bands allocated to the radio astronomy on a primary basis Question ITU-R 227/7

ASD-STAN - Aerospace and Defence Industries Association of Europe - Standardization, Super electric discharge time

  • PREN 2349-304-2000 Aerospace Series Requirements and Test Procedures for Relays and Contactors Part 304: Operate and Release Time (Edition P 1)




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved