ZH

RU

ES

nb/t20119-2012

nb/t20119-2012, Total:252 items.

In the international standard classification, nb/t20119-2012 involves: Nuclear energy engineering, Wind turbine systems and other alternative sources of energy, Iron and steel products, Electrical wires and cables, Switchgear and controlgear, Electrical accessories, Power transmission and distribution networks, Pipeline components and pipelines, Non-ferrous metals, Ferrous metals, Radiation protection, Fasteners, Products of non-ferrous metals, Occupational safety. Industrial hygiene, Testing of metals, Welding, brazing and soldering, Shafts and couplings, Installations in buildings, Domestic safety, Mining and quarrying, Solar energy engineering, Energy and heat transfer engineering in general, Conducting materials.


Professional Standard - Energy, nb/t20119-2012

  • NB/T 20119-2012 Material item management requirements for nuclear power engineering
  • NB/T 31026-2012 Electric design code for windpower projects
  • NB/T 20184-2012 General specification on transport vessel for fresh fuel assembly of PWR nuclear power plants
  • NB/T 20007.7-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 7:Austenitic stainless steel plate and strip for Class S1 and S2 supports
  • NB/T 20061-2012 Practice for application of human factors engineering to systems,equipment,and facilities of nuclear power plant
  • NB/T 20088-2012 Requirements for the replacement parts and components for safety class equipment in nuclear power plants
  • NB/T 31030-2012 Specifications for engineering geological investigation of wind power projects
  • NB/T 20160-2012 The technical specification for watertight stainless steel liner of PWR nuclear power plant
  • NB/T 1002-2012 Guides for Preparation of preliminary design of underground oil storage in rock caverns project of national oil strategic reserve (provisional)
  • NB/T 1003-2012 Construction code for underground oil storage in rock caverns project of national oil strategic reserve (provisional)
  • NB/T 1004-2012 Methods for preparation of preliminary design budgetary estimation of underground oil storage in rock caverns project of national oil strategic reserve (provisional)
  • NB/T 31029-2012 Specification of wind energy resource measurement and marine hydrographic observation for offshore wind power projects
  • NB/T 31031-2012 Code for preparation of offshore wind power projects pre-feasibility study report
  • NB/T 31032-2012 Code for preparation of offshore wind power projects feasibility study report
  • NB/T 31033-2012 Code for construction planning of offshore wind power projects
  • NB/T 31034-2012 Flexible and torsion resistant cables of rated voltages up to and including 1.8/3kV for wind turbine.Part 1:Cables for rated voltages up to and including 0.6/1kV
  • NB/T 31035-2012 Flexible and torsion resistant cables of rated voltages up to and including 1.8/3kV for wind turbine.Part 2:Cables for rated voltage of 1.8/3kV
  • NB/T 31036-2012 Flexible and torsion resistant cables of rated voltages up to and including 1.8/3kV for wind turbine.Part 3:Methods for torsion test
  • NB/T 31037-2012 Low-voltage switchgear and controlgear assemblies for wind power generation
  • NB/T 31038-2012 Low-voltage reactive power compensation assemblies for wind power generation
  • NB/T 31039-2012 Technical specification for lightning protection system of wind turbine
  • NB/T 31040-2012 Surge protective devices with integral short circuit protection function
  • NB/T 31041-2012 Converter of offshore doubly-fed wind turbine generator
  • NB/T 31042-2012 Converter of offshore permanent magnet wind turbine generator
  • NB/T 31043-2012 Technical specification for main control system of offshore wind turbine generator system
  • NB/T 31044-2012 Technical specification for permanent magnet wind turbine generator-converter set
  • NB/T 20005.14-2012 Carbon steel and low alloy steel for pressurized water reactor nuclear power plants.Part 14:Class 2 and 3 butt-welding seamless fittings
  • NB/T 20006.5-2012 Alloy steel for pressurized water reactor nuclear power plants.Part 5:Mn-Ni-Mo alloy steel forgings for reactor pressure vessel heads
  • NB/T 20006.7-2012 Alloy steel for pressurized water reactor nuclear power plants.Part 7:Mn-Ni-Mo steel forgings for steam generators shells
  • NB/T 20006.8-2012 Alloy steel for pressurized water reactor nuclear power plants.Part 8:Mn-Ni-Mo steel forgings for steam generator upper heads
  • NB/T 20006.13-2012 Alloy steel for pressurized water reactor nuclear power plants.Part 13: Alloy steel forgings for reactor coolant pump motor shaft assembles
  • NB/T 20007.4-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 4: Niobium stabilized austenitic stainless steel forgings for the shafts of reactor coolant pumps
  • NB/T 20007.13-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 13: Forged tubes and elbows made from controlled nitrogen austenitic stainless steel for reactor coolant piping
  • NB/T 20007.21-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 21: Martensitic stainless steel plates for use in making steam generator tube support plates
  • NB/T 20007.26-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 26:Austenitic-ferritic stainless steel centrifugally cast pipes for reactor coolant piping
  • NB/T 20008.8-2012 Other materials for pressurized water reactor nuclear power plants.Part 8:Hot extruded nickel-chromium-iron alloy pipes
  • NB/T 20008.16-2012 Other material for pressurized water reactor nuclear power plants.Part 16:Cabolt-base alloy for control rod drive mechanism
  • NB/T 20008.17-2012 Other material for pressurized water reactor nuclear power plants.Part 17: Class 2 and 3 unalloyed and alloy ductile iron castings
  • NB/T 20039.3-2012 Code on nuclear air and gas treatment.Ventilation, air conditioning and air cleaning.Part 3: Ductwork
  • NB/T 20143.1-2012 Code on nuclear air and gas treatment Process gas treatment.Part 1: Hydrogen recombiner
  • NB/T 20144-2012 Initial criticality tests for pressurized water reactor of nuclear power plants
  • NB/T 20145-2012 Compiling criteria of commissioning test procedure and report for nuclear power plants
  • NB/T 20146-2012 Design standard of automatic fire alarm system of nuclear power plants
  • NB/T 20147-2012 Criteria for physical protection systems for nuclear power plants
  • NB/T 20148-2012 Resistance temperature detectors important to safety in nuclear power plants
  • NB/T 20149-2012 Qualification procedure for pressure transmitter important to safety of nuclear power plants
  • NB/T 20150-2012 Characteristics and test methods of self-powered neutron detectors for nuclear power plants
  • NB/T 20151-2012 Guideline for preparing ageing management programme of pressurized water reactor nuclear power plants
  • NB/T 20152-2012 Ageing management guideline of piping in nuclear power plants
  • NB/T 20153-2012 Ageing management guideline of prestressed concrete containment in nuclear power plants
  • NB/T 20154-2012 Guideline of ageing management for PWR reactor pressure vessels
  • NB/T 20155-2012 Aging management on class 1E equipment used in nuclear power plants
  • NB/T 20156-2012 Requirement for compilation and optimization for preventive maintenance program at nuclear power plants
  • NB/T 20157-2012 Quality assurance requirements for construction of nuclear power project
  • NB/T 20158-2012 Specification for volute concrete construct of circulating water pump of pressurized water reactors nuclear power plants
  • NB/T 20159-2012 The construction technical specification for liner of reactor building of PWR nuclear power plant
  • NB/T 20161-2012 Installation and commissioning technical guideline for ex-core neutron flux measuring system for pressurized water reactor of nuclear power plants
  • NB/T 20162-2012 Technical requirements on the cleaning areas establishment and maintenance of PWR nuclear island equipment during storage, installation and start-up
  • NB/T 20163-2012 Qualification procedure for containment spray pump and low head safety injection pump of pressurized water reactor nuclear power plant
  • NB/T 20164-2012 Qualification procedure for auxiliary feed water motor-driven pump of pressurized water reactor nuclear power plant
  • NB/T 20165-2012 Qualification procedure for residual heat removal pump of pressurized water reactor nuclear power plant
  • NB/T 20166-2012 Qualification procedure for charging pump of pressurized water reactor nuclear power plant
  • NB/T 20167-2012 Qualification procedure for isolation valve of pressurized water reactor nuclear power plants
  • NB/T 20168-2012 Qualification procedure for check valve of pressurized water reactor nuclear power plants
  • NB/T 20169-2012 Qualification procedure for auxiliary feed water turbine-driven pump of pressurized water reactor nuclear power plant
  • NB/T 20170-2012 Qualification procedure of safety class diesel-generator units for nuclear power plants
  • NB/T 20171-2012 Qualification procedure for safety class 3 pump of pressurized water reactor nuclear power plant
  • NB/T 20172-2012 Technical rules for nuclear engineering surveying datum network establishment
  • NB/T 20173-2012 Requirements for construction and test of polar crane at PWR reactor building
  • NB/T 20174-2012 The technical requirements of field fabrication and acceptance for carbon and stainless steel tank in pressurized water reactor nuclear power plants
  • NB/T 20175-2012 Requirements for installation and acceptance of fuel handling and storage system at PWR plant
  • NB/T 20176-2012 Design requirement for hydrogen supply, nitrogen supply, oxygen supply, carbon dioxide supply system of PWR nuclear power plant
  • NB/T 20177-2012 Design criteria for component cooling water system of pressurized water reactor nuclear power plants
  • NB/T 20178-2012 Design criteria of nuclear sampling system of pressurized water reactor nuclear power plant
  • NB/T 20179-2012 Design criteria for compressed air system of nuclear power plant
  • NB/T 20180-2012 Design criteria for compressed air supplying system of nuclear island in nuclear power plant
  • NB/T 20181-2012 Technical specification of radiation environmental impact assessment for airborne radioactive effluents of nuclear power plant on operational states
  • NB/T 20183-2012 Compilation guideline for nuclear power plant reliability assurance program
  • NB/T 20185-2012 Design criterion of radiation zoning inside of the PWR nuclear power plant
  • NB/T 20186-2012 Calculation of doses to public from routine releases of reactor radioactive effluents
  • NB/T 20187-2012 Design criteria for reactor coolant system in pressurized water reactor nuclear power plants
  • NB/T 20188-2012 Design criteria for essential service water system for pressuried water reactor nuclear power plant
  • NB/T 20189-2012 Interface design criteria concerning nuclear steam supply system and turbine building of pressuried water reactor nuclear power plant
  • NB/T 20190-2012 Noise control for production buildings of nuclear power plants
  • NB/T 20192-2012 General requirements for pilot operated safety valves of pressurized water reactor nuclear power plant
  • NB/T 20194-2012 Design criterion of radiation shield in the PWR nuclear power plant
  • NB/T 20195-2012 Reactor thermal power measurement procedure for reactor core in pressurized water nuclear power plant
  • NB/T 25009-2012 Energy statistics procedure in pressurized water nuclear power plants
  • NB/T 47020-2012 Type and specification for pressure vessel flanges
  • NB/T 47021-2012 A-type socket-weld flange
  • NB/T 47022-2012 B-type socket-weld flange
  • NB/T 47023-2012 Welding neck flange
  • NB/T 47024-2012 Nonmetallic gaskets
  • NB/T 47025-2012 Spiral wound gaskets
  • NB/T 47026-2012 Double-jacketed gaskets
  • NB/T 47027-2012 Stud blots & nuts for body flange
  • NB/T 47028-2012 Nickel and nickel alloy forging for pressure vessels
  • NB/T 47029-2012 Aluminium and aluminium alloy forgings for pressure vessels
  • NB/T 51003-2012 Design specifications of coal face of gas comprehensive treatment
  • NB/T 51004-2012 Specifications for compiling geology instructions of coal uncovering in mine passageway
  • NB/T 51005-2012 Design compiling specifications of coal uncovering in mine passageway
  • NB/T 51006-2012 Technical specifications of gas pre-drainage and eliminating outburst effect assessment
  • NB/T 51007-2012 Technical specifications for integrated pillarless coal production and methane extraction
  • NB/T 51008-2012 Determination of thermal environment and evaluation methods in coal mine
  • NB/T 47013.7-2012 Nondestructive testing of pressure equipments. Part 7:Visual examination
  • NB/T 47013.8-2012 Nondestructive testing of pressure equipments.Part 8:Leak Testing
  • NB/T 47013.9-2012 Nondestructive testing of pressure equipments.Part 9:Acoustic emission testing
  • NB/T 20005.2-2012 Carbon steel and low alloy steel for pressurized water reactor nuclear power plants.Part 2:Forgings for class 2,3 heat exchanger tube plates
  • NB/T 20005.3-2012 Carbon steel and low alloy steel for pressurized water reactor nuclear power plants.Part 3:Forgings for class 2,3 auxiliary pump shafts
  • NB/T 20005.4-2012 Carbon steel and low alloy steel for pressurized water reactor nuclear power plants.Part 4:The forged or rolled parts for use in steam generator main steam systems,feedwater flow control systems,auxiliary feedwater systems and turbine bypass systems
  • NB/T 20005.8-2012 Carbon steel and low alloy steel for PWR nuclear power plant.Part 8:Steel plates,beams and bars for class S1 and S2 supports
  • NB/T 20005.11-2012 Carbon steel and low alloy steel for pressurized water reactor nuclear power plant.Part 11:Seamless pipes for class S1 and S2 supports
  • NB/T 20005.13-2012 Carbon steel and low alloy steel for pressurized water reactor nuclear power plants.Part 13:Seamless drawn carbon steel tubes for class 2 and 3 heat exchangers
  • NB/T 20005.16-2012 Carbon steel and low alloy steel for pressurized water reactor nuclear power plants.Part 16: Elbow for main steam system
  • NB/T 20007.2-2012 Stainless steel for pressurized water reactor of nuclear power plants.Part 2: Austenitic stainless steel forgings for class 2 and 3 tube plates of heat exchanger
  • NB/T 20007.3-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 3:Controlled nitrogen content austenitic stainless steel forgings for core upports and upper support plates
  • NB/T 20007.6-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 6:Controlled nitrogen content anstenitic stainless steel plate for Reactor Internal
  • NB/T 20007.15-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 15:Strain hardened hot worked rolled or forged bars made from anstenitic stainless steel used for the fabrication of bolting material for reactor internals
  • NB/T 20007.16-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 16:Class 2 and 3 martensitic stainless steel forgings
  • NB/T 20007.17-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 17:Martensitic stainless steel forgings used for internal hold down springs
  • NB/T 20007.18-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 18:Rolled or forged martensitic stainless steel parts for class 2 and 3 auxiliary pump drive shafts
  • NB/T 20007.22-2012 Stainless steel for pressurized water reactor nuclear power plants.Part 22:Seamless pipes made from martensitic stainless steel for drive rods of reactor control rod drive mechanisms
  • NB/T 20008.1-2012 Other material for pressurized water reactor nuclear power plant.Part 1:Alloy steel forgings for use in reactor coolant system supports
  • NB/T 20008.3-2012 Other material for pressurized water reactor nuclear power plants.Part 3:Class 3 Copper-Aluminium alloy castings for anxiliary system pumps and valves
  • NB/T 20008.4-2012 Other material for pressurized water reactor nuclear power plants.Part 4:Forged or rolled class 1,2 and 3 nickel-chromium-iron alloy parts
  • NB/T 20008.5-2012 Other material for pressurized water reactor nuclear power plants.Part 5:Class 1 and 2 hot rolled nickel-chromium-iron alloy plates
  • NB/T 20008.6-2012 Other material for pressurized water reactor nuclear power plants.Part 6:Hot rolled nickel-chromium-iron alloy plates
  • NB/T 20008.9-2012 Other material for pressurized water reactor nuclear power plants.Part 9:Hot rolled or hot extruded nickel-chromium-iron alloy bars
  • NB/T 20008.10-2012 Other material for pressurized water reactor nuclear power plants.Part 10:Ni-Cr-Fe alloy rolled bars used for internal support pins and bolting
  • NB/T 20008.15-2012 Other material for pressurized water reactor nuclear power plants.Part 15:Titanium plate for use in the fabracation of class 3 heat exchanger plates
  • NB/T 20009.6-2012 Welding material for pressurized water reactor nuclear power plants.Part 6:Carbon steel electrodes and rods for gas shielded arc welding of class 1,2,3 components
  • NB/T 20009.7-2012 Welding material for pressurized water reactor nuclear power plants.Part 7:Stainless steel wires and filler rods for class 1,2,3 components
  • NB/T 20009.8-2012 Welding material for pressurized water reactor nuclear power plants.Part 8: Nickel-based alloy wires and filler rods for class 1,2,3 components
  • NB/T 20037.2-2012 Probabilistic safety assessment for nuclear power plant applications.Part 2: Level 1 PSA for internal events at-low power and shutdown
  • NB/T 20037.3-2012 Probabilistic safety assessment for nuclear power plant applications.Part 3: Flooding
  • NB/T 20039.8-2012 Code on nuclear air and gas treatment.Ventilation, air conditioning and air cleaning.Part 8: Medium efficiency air filters
  • NB/T 20039.13-2012 Code on nuclear air and gas treatment.Ventilation, air conditioning and air cleaning.Part 13: Iodine adsorbers(type III)
  • NB/T 20039.15-2012 Code on nuclear air and gas treatment.Ventilation, air conditioning and air cleaning.Part 15: Adsorbent media
  • NB/T 20057.1-2012 Pressurized water reactor nuclear power plants reactor system design.Core.Part 1: Nuclear design
  • NB/T 20057.2-2012 Pressurized water reactor nuclear power plants reactor system design.Core.Part 2: Thermal hydraulic design criteria
  • NB/T 20057.3-2012 PWR nuclear power plants reactor system design.Core.Part3:Fuel assembly
  • NB/T 20057.4-2012 PWR nuclear power plants reactor system design.Core.Part4:Core components
  • NB/T 20058-2012 The application of visual display units in control rooms of nuclear power plants
  • NB/T 20059-2012 The operator controls in control rooms of nuclear power plants
  • NB/T 20060-2012 The separation criterion for instrumentation and control systems important to safety in nuclear power plants
  • NB/T 20062-2012 Batteries for uninterruptible power supply systems for nuclear power plants
  • NB/T 20063-2012 Glossary of terms of instrumentation and control for nuclear power plants
  • NB/T 20064-2012 Installation and test requirement of in-core instrumentation system in pressured water reator nuclear power plant
  • NB/T 20065-2012 Installation and arrangement requirement for transducer and transmitter important to safety in nuclear power plant
  • NB/T 20066-2012 The design criteria for nuclear power plants station blackout
  • NB/T 20067-2012 Identification for safety class equipment in nuclear power plants
  • NB/T 20068-2012 Requirements for coping with common cause failure(CCF)of instrumentation and control systems important to safety in nuclear power plants
  • NB/T 20069-2012 Performance monitoring test of instrumentation channels important to safety in nuclear power plants
  • NB/T 20070-2012 Criteria for design,installation,and qualification of raceway systems for class 1E circuits in nuclear power plants
  • NB/T 20071-2012 Requirements for electrical supplies of instrumentation and control systems important to safety in nuclear power plants
  • NB/T 20072-2012 Determination and maintenance of trip setpoints for instrumentation of safety system in nuclear power plants
  • NB/T 20073-2012 Criterion for instrumentation and control equipment groundig in nuclear power plants
  • NB/T 20074-2012 Qualification of class 1E motor control centers for nuclear power plants
  • NB/T 20075-2012 Protection provided by electrical equipment against external impact for nuclear power plants
  • NB/T 20076-2012 Earthquake instrumentation criteria for nuclear power plants
  • NB/T 20077-2012 Criteria for the handling and initial evaluation of records from nuclear power plants seismic instrumentation
  • NB/T 20078-2012 Qualification procedure for safety-related pneumatic control valve of pressurized water reactor nuclear power plants
  • NB/T 20079-2012 Qualification procedure for safety-class eletric actuators applied in nuclear power plants
  • NB/T 20080-2012 Qualification of class 1E lead storage batteries for nuclear power plants
  • NB/T 20081-2012 Qualification procedure for class 1E transformer applied in pressurized-water reactor nuclear power plants
  • NB/T 20082-2012 Qualification procedure for safety-class diesel-generator applied as standby power supplies for nuclear power plants
  • NB/T 20083-2012 Criteria for lubricating oil systems design for emergency diesel generator of nuclear power plants
  • NB/T 20084-2012 Qualification procedure for safety class residual heat removal motor applied in nuclear power plants
  • NB/T 20085-2012 Qualification procedure for safety class high-voltage switchboard applied in nuclear power plants
  • NB/T 20086-2012 Assessing,monitoring,and mitigating aging effects on class 1E equipment used in nuclear power plants
  • NB/T 20087-2012 Aging management guidance for instrument and control cables important to safety for nuclear power plants
  • NB/T 20089-2012 Standard criteria for the protection of class 1E power systems and equipment in nuclear power plants
  • NB/T 20090-2012 Requirements for preoperational tests of class 1E power systems in nuclear power plants
  • NB/T 20091-2012 Inspection guide for the turbine of pressurized water reactor nuclear power plants
  • NB/T 20092-2012 Inspection guide for the moisture seperator reheater of pressurized water reactor nuclear power plants
  • NB/T 20093-2012 Qualification of safety-related valve actuators for nuclear power plants
  • NB/T 20094-2012 Containment ventilation system of pressurized water reactor nuclear power plant
  • NB/T 20095-2012 Design criteria for HVAC systems located outside containment of PWR nuclear power plant
  • NB/T 20096-2012 Failure mode and effects analysis for system of nuclear power plants
  • NB/T 20097-2012 Concrete containment functional design requirements for PWR nuclear power plant
  • NB/T 20098-2012 Design criteria for containment hydrogen control system of pressurized water reactor nuclear power plants
  • NB/T 20099-2012 Analysis demand for loss-of-coolant accident of pressurized water reactor nuclear power plants
  • NB/T 20100-2012 Principles for main primary system and main steam system overpressure analysis of pressurized water reactor nuclear power plants
  • NB/T 20101-2012 Analysis requirement for rod ejection accidents of pressurized water reactor nuclear power plants
  • NB/T 20102-2012 Determination of steady state neutron reaction rate distributions and reactivity of nuclear reactors
  • NB/T 20103-2012 Accident analysis and safety criteria for pressurized water reactor nuclear power plant
  • NB/T 20104-2012 Analysis requirement for anticipated transient without scram on pressurized water reactor nuclear power plants
  • NB/T 20105-2012 Load code for the design of nuclear power plants building structures
  • NB/T 20106-2012 Model regulation of cooling water for nuclear power plant
  • NB/T 20107-2012 Technical regulation for construction of reactor coolant pump installation in PWR nuclear power plant
  • NB/T 20108-2012 Technical regulation of containment penetration installation in PWR nuclear power plant
  • NB/T 20109-2012 Technical specification of neutron flux guide tube installation in reactor building for PWR nuclear power plant
  • NB/T 20110-2012 Technical regulation for installation of PWR nuclear power auxiliary system equipment
  • NB/T 20111-2012 General technical regulation of safety-related valves installation in PWR nuclear power plant
  • NB/T 20112-2012 Technical regulation of the cable terminal connection in the reactor building for PWR nuclear power plant
  • NB/T 20113-2012 Technical regulation for construction of HVAC installation in PWR nuclear power plant
  • NB/T 20114-2012 The technical regulation of pressurized water reactor CRDW power supply system installlation
  • NB/T 20115-2012 Technical regulation for construction and acceptance of reactor pressure vessel head installation in PWR nuclear power plant
  • NB/T 20116-2012 The general requirements of informatiztion for nuclear power plants construction project management
  • NB/T 20117-2012 Prescriptions of safety management for construction of nuclear power project
  • NB/T 20118-2012 Regulation for fire protection for nuclear power plants construction
  • NB/T 20120-2012 Management provision for the technology of nuclear power engineering constrution
  • NB/T 20121-2012 The regulation for editing construction organization plan of nuclear power project
  • NB/T 20122-2012 Checking-and-acceptance management provision for the quality and the hand-over of nuclear power engineering construction
  • NB/T 20123-2012 Standard for division of sub-section and sub-project in construction of nuclear power plant
  • NB/T 20124-2012 Code for acceptance of construction of biological shielding concrete of PWR nuclear power plant
  • NB/T 20125-2012 Construction specification of the foundation grouting for PWR safety important facility
  • NB/T 20126-2012 Specifications for construction and acceptance of caulking of PWR nuclear island plant
  • NB/T 20127-2012 Technical requirements for embedment parts manufacture and installation of PWR nuclear power plant
  • NB/T 20128-2012 specification on construction and acceptance of nuclear island foundation pit
  • NB/T 20129-2012 General technical regulation for installation,test and acceptance of emergency diesel generator of nuclear island in pressurized water reactor nuclear power plants
  • NB/T 20130-2012 Concrete radiation shielding
  • NB/T 20131-2012 Design criteria for emergency core cooling sump of pressurized water reactors nuclear power plants
  • NB/T 20132-2012 Design requirements of personnel airlock for containment in pressurized water reactor nuclear power plants
  • NB/T 20133.1-2012 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 1:General requirements
  • NB/T 20133.2-2012 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 2: Standard test method for evaluating coatings at simulated design basis accident (DBA) conditions
  • NB/T 20133.3-2012 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 3: Standard test method for effects of gamma radiation
  • NB/T 20133.4-2012 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 4:Determination of the decontaminability of coatings
  • NB/T 20133.5-2012 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 5:Standard test method for chemical resistance
  • NB/T 20133.6-2012 Specifications for protective coatings used in pressurized water reactor nuclear power plants.Part 6:Coating operation
  • NB/T 20134-2012 Guidelines to ensure quality of collected data on reliability of nuclear power plants
  • NB/T 20135-2012 General guidelines for reliability data exchange of nuclear power plants
  • NB/T 20136-2012 Desgin criterion for radiation controlled area access of nuclear power plants
  • NB/T 20137-2012 Regulation for staff training of radiation protection in nuclear power plants
  • NB/T 20138-2012 Individual monitoring and workplace monitoring of nuclear power plant
  • NB/T 20139-2012 Technical criteria for environmental radioactivity background investigation for nuclear power plant
  • NB/T 20140-2012 Technical specification for radiation protection of nuclear power plants siting
  • NB/T 20141-2012 Packaging, transportation, loading & unloading and storage of fresh fuel assembly for PWR nuclear power plant
  • NB/T 20142-2012 Guide for chemical decontamination of primary loop system and components of PWR nuclear power plants
  • NB/T 31021-2012 Specification for scientific and technological records filing and arrangement of wind farm
  • NB/T 31022-2012 Code for acceptance of wind power engineering reaching the standard and putting into production
  • NB/T 51002-2012 Method of solid-filling in fully-mechanized coal mining
  • NB/T 32001-2012 Technical specification for environmental impact assessment of photovoltaic power station
  • NB/T 32002-2012 Solar lawn light
  • NB/T 32003-2012 Self-regulating heating cables for solar heat application
  • NB/T 34007-2012 General specification for biomass cooking and heating stoves
  • NB/T 34008-2012 Test method for biomass cooking and heating stoves
  • NB/T 34009-2012 General specification for biomass cooking and radiant heating stoves
  • NB/T 34010-2012 Test method for biomass cooking and radiant heating stoves
  • NB/T 34011-2012 Specifications for sewage treatment device of biomass gasification system
  • NB/T 31023-2012 Hydraulic caliper disc brake for speed-shaft of wind turbine generator systems
  • NB/T 31024-2012 Hydraulic disc brake for yawing of wind turbine generator systems
  • NB/T 31025-2012 Ring type forgings of wind turbine generator system
  • NB/T 31028-2012 Code for preparation of safety pre-assessment report of wind power projects
  • NB/T 20182-2012 Technical specification for radiation environmental impact assessment of airborne radioactive material release in nuclear power plant accident conditions
  • NB/T 20191-2012 Accessibility Criteria for In-service Inspection in Structural Design of PWR Nuclear Power Plant
  • NB/T 20193-2012 Technical specification for design of steam and water piping in conventional island of nuclear power plant
  • NB/T 31027-2012 Regulations for compiling safety acceptance evaluation report of wind farm project
  • NB/T 42002-2012 Notified aluminum busbar for electricians
  • NB/T 20138-2012/6250 Individual monitoring and workplace monitoring of nuclear power plant

国家能源局, nb/t20119-2012

  • NB/T 42001.1-2012 Energy consumption limit per unit product of thermal power equipment manufacturing enterprises Part 1: Power station boilers

German Institute for Standardization, nb/t20119-2012

  • DIN EN 61788-13:2013 Superconductivity - Part 13: AC loss measurements - Magnetometer methods for hysteresis loss in superconducting multifilamentary composites (IEC 61788-13:2012); German version EN 61788-13:2012




Copyright ©2007-2023 ANTPEDIA, All Rights Reserved